• SCHWEIZER AREAL, MURRHARDT

    PLANNING UPDATE
    STATUS OCTOBER 2024
  • START OF CONSTRUCTION

    EXPECTED SUMMER 2025
  • VIEW OF INNER COURTYARD

  • HOUSE 1

    SEEN FROM THE INNER COURTYARD
  • INTERSECTION THEODOR-HEUSS-STRASSE

    OBERMÜHLENWEG
  • ALTERNATIVE PLANNING

    TWO FULL STOREYS
  • VIEW THEODOR-HEUSS-STRASSE

  • VIEW ALONG THE MURR

  • VIEW FROM THE WEST

    ALONG THE MURR
  • VIEW OF THE INNER COURTYARD

  • INTERIOR DESIGN & FURNISHING EXAMPLES

NEW DEVELOPMENT OF SCHWEIZER AREAL

A total of six multi-storey buildings will be built on the site as well as a kindergarten building, which will be operated by the town of Murrhardt.

The residential buildings along Theodor-Heuss-Straße (buildings 1+2) will be built as three-storey buildings with a final staggered storey and will each have two penthouse flats with spacious roof terraces. Both houses each have 14 flats in different sizes. The two identical houses 3+4 on Obermühlenweg are located opposite the medical centre. The separate entrance and exit to the underground car park and the two-storey kindergarten are also located on Obermühlenweg.

In the ‘inner courtyard’ of the site, two residential buildings will be built along the Murr, each with two storeys and an additional top floor with spacious roof terraces. There will be 104 parking spaces in the underground car park. Of these, around 40 parking spaces will be prepared with charging facilities for electric vehicles. The bicycle parking spaces will also be located in the underground car park.

 

  • FURTHER INFORMATION

    We are happy to answer your questions and provide additional information about this project.

    CONTACT:

    Mr. Schneidewind-Binder
    Tel +49 (0)7142 98 998 36
    info@schlegel-concepts.com